Tagged: Technical solution

NAWAPI ending their 2nd round MAR pilot test

On November  30th 2023, the two rounds of infiltration – storage – recovery at GK1 (170 m depth, brackish aquifer) and GK2 (104 m depth, fresh aquifer) came to an end. Over the last...