Report No 6: Drilling and installation of monitoring well for ASR pilot in Hau Giang province

Report No 6: Drilling and installation of monitoring well for ASR pilot in Hau Giang province

Report No 6: Drilling and installation of monitoring well for ASR pilot in Hau Giang province
  • Version
  • Download
  • File Size 3.30 MB
  • File Count 1
  • Create Date 28/05/2025
  • Last Updated 02.06.2026

Rất tiếc, mục này chỉ tồn tại ở Tiếng Anh (Mỹ). For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.

Report No 6: Drilling and installation of monitoring well for ASR pilot in Hau Giang province
February 2025

In January, the DWRPIS team drilled and installed the monitoring well M1 for the ASR project. The main goal of the drilling was to investigate the position and the characteristics of the target aquifer qp1. This report summarizes the drilling and study results.

Attached Files

FileAction
ASR_Nga_Bay_Report 06_monitoring well M1.pdfDownload