Report No 6: Drilling and installation of monitoring well for ASR pilot in Hau Giang province
- Version
- Download
- File Size 3.30 MB
- File Count 1
- Create Date 28/05/2025
- Last Updated 02.06.2026
Report No 6: Drilling and installation of monitoring well for ASR pilot in Hau Giang province
February 2025
In January, the DWRPIS team drilled and installed the monitoring well M1 for the ASR project. The main goal of the drilling was to investigate the position and the characteristics of the target aquifer qp1. This report summarizes the drilling and study results.
Attached Files
| File | Action |
|---|---|
| ASR_Nga_Bay_Report 06_monitoring well M1.pdf | Download |

