{"id":1745,"date":"2024-02-15T10:30:04","date_gmt":"2024-02-15T03:30:04","guid":{"rendered":"https:\/\/igpvn.vn\/?p=1745"},"modified":"2024-02-15T10:30:04","modified_gmt":"2024-02-15T03:30:04","slug":"khoan-gieng-quan-trac-tai-vi-tri-asr-moi-tai-nga-bay","status":"publish","type":"post","link":"https:\/\/igpvn.vn\/en\/khoan-gieng-quan-trac-tai-vi-tri-asr-moi-tai-nga-bay\/","title":{"rendered":"Drilling of monitoring well at new ASR site in Nga Bay"},"content":{"rendered":"<p>The \u201cPartners for Water\u201d project has successfully drilled a new monitoring well down to a depth of 210 m. A medium coarse sandy aquifer (qp<sub>1<\/sub>) was found and will be screened from 168 -188 m depth, while clay aquitards were found above (150-156 m) and below (195-206 m). The well has been developed and a short pumping test was conducted. Sediment samples were collected and will be send to BGR in Hannover for a range of analyses.<\/p>\n<div id=\"attachment_1741\" style=\"width: 1034px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-1741\" decoding=\"async\" loading=\"lazy\" class=\"size-large wp-image-1741\" src=\"http:\/\/igpvn.vn\/wp-content\/uploads\/2024\/02\/20240112-1-1024x575.jpg\" alt=\"\" width=\"1024\" height=\"575\" srcset=\"https:\/\/igpvn.vn\/wp-content\/uploads\/2024\/02\/20240112-1-1024x575.jpg 1024w, https:\/\/igpvn.vn\/wp-content\/uploads\/2024\/02\/20240112-1-300x169.jpg 300w, https:\/\/igpvn.vn\/wp-content\/uploads\/2024\/02\/20240112-1-768x431.jpg 768w, https:\/\/igpvn.vn\/wp-content\/uploads\/2024\/02\/20240112-1.jpg 1223w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><p id=\"caption-attachment-1741\" class=\"wp-caption-text\">Drilling of the monitoring well<\/p><\/div>\n<p>&nbsp;<\/p>\n<p><div id=\"attachment_1742\" style=\"width: 652px\" class=\"wp-caption aligncenter\"><img aria-describedby=\"caption-attachment-1742\" decoding=\"async\" loading=\"lazy\" class=\"wp-image-1742 size-full\" src=\"http:\/\/igpvn.vn\/wp-content\/uploads\/2024\/02\/20240112-2-e1707967689611.jpg\" alt=\"\" width=\"642\" height=\"856\" srcset=\"https:\/\/igpvn.vn\/wp-content\/uploads\/2024\/02\/20240112-2-e1707967689611.jpg 642w, https:\/\/igpvn.vn\/wp-content\/uploads\/2024\/02\/20240112-2-e1707967689611-225x300.jpg 225w\" sizes=\"(max-width: 642px) 100vw, 642px\" \/><p id=\"caption-attachment-1742\" class=\"wp-caption-text\">Inspection of core samples by Ate Oosterhof (VEI)<\/p><\/div><\/p>","protected":false},"excerpt":{"rendered":"<p>The \u201cPartners for Water\u201d project has successfully drilled a new monitoring well down to a depth of 210 m. A medium coarse sandy aquifer (qp1) was found and will be screened from 168 -188&#46;&#46;&#46;<\/p>\n","protected":false},"author":3,"featured_media":1741,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[32,37],"_links":{"self":[{"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/posts\/1745"}],"collection":[{"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/comments?post=1745"}],"version-history":[{"count":1,"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/posts\/1745\/revisions"}],"predecessor-version":[{"id":1746,"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/posts\/1745\/revisions\/1746"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/media\/1741"}],"wp:attachment":[{"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/media?parent=1745"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/categories?post=1745"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/igpvn.vn\/en\/wp-json\/wp\/v2\/tags?post=1745"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}